Recently, the steel structure division of CSSC Chengxi Shipbuilding Co., Ltd. was awarded the order of 50 parts of the European Wind Tower for two specifications of General Electric (GE). The total tonnage is about 570 tons, and the contract delivery time is March 2013. Mid-term.
Nylon Insert And Cap Nut
Cap Nut,Domed Cap Nuts,Nylon Insert Lock Nut
Hex Nut,Hex Bolt Co., Ltd. , http://www.nshexbolts.com