Flossmoor live-fire training

Here's a message from Tim Olk:

This photo series captures the final stage of several days of training conducted at buildings on a property being cleared for a new shopping center in Flossmoor.

firemen inside burned out house

Tim Olk photo

fire in house for training purposes

Tim Olk photo

fire in house for training purposes

Tim Olk photo

fire in house for training purposes

Tim Olk photo

fire in house for training purposes

Tim Olk photo

fire in house for training purposes

Tim Olk photo

fire in house for training purposes

Tim Olk photo

probationary firefighter

Tim Olk photo

house fully engulfed in fire

Tim Olk photo

house fully engulfed in fire

Tim Olk photo

These images provide a behind-the-scenes look at how firefighters prepare for real emergencies. The training took place in structures that are soon to be demolished for a new commercial development, allowing crews to practice in a controlled and safe environment. Each photo highlights different aspects of the process, from the intense flames to the dedicated efforts of the firefighters involved.

Valve - API-6A

Size : 1.13/16"
Pressure : 15000Ppsi (103.5Mpa)
Material: EE
Performance : PR1
Temperature : L U (-46° – 121°)
Specification : PSL3

6A-Valve, Gate Valve, FC Gate Valve,Gate Valve Assembly

Jiangsu Solid Machinery Manufacturing Co., Ltd. , https://www.oilsolid.com