Mixer cleaning and maintenance

Cleaning
Because the concrete will solidify into a hard block in a short time, and it is corrosive to the steel and paint, after every use of the concrete tank, the concrete adhered to the concrete tank and the inlet and outlet must be cleaned daily. Serious work. These include:
a. Rinse the feed inlet with water before each charge to keep the feed inlet moist while charging.
b. Fill the cleaning water tank that comes with the vehicle while filling;
c. After filling, wash the inlet and clean the remaining concrete near the inlet;
d. After unloading at the construction site, flush the discharge chute, then add the cleaning water to the concrete tank 3
混凝土搅拌车

Concrete mixer truck

0-40 L; keep the concrete tank rotating slowly at positive speed while the vehicle is returning;
e. Remember to drain the concrete tank before loading the next time;
f. Clean the concrete tank and the surrounding of the inlet and outlet at the time of daily work to ensure that there is no cement and concrete agglomeration.
If these tasks are not carried out carefully once, they will cause great trouble for future work.
maintenance
Concrete mixer vehicle after-sales maintenance 1: rationally determine the protection cycle. The automobile protection cycle refers to the mileage or duration of the car protection. In the process of practical application, owners should refer to the protection cycle introduced by the automobile manufacturer, contact the automobile's own skill and operating conditions, and properly adjust the protection cycle. Generally speaking, new vehicles are used under the premise of superior road conditions and do not need to be protected too often. The period of protection of the manufacturer's rules can be used as an upper limit. However, if the skills of the automobile are poor or the preconditions are bad, the protection cycle should be appropriately shortened.
II: Free application of free testing. The free testing exercise carried out by concrete mixer manufacturers is often beneficial to the owner of the vehicle. The owner can apply these inspection campaigns to carry out specific physical examinations on the favorite vehicles, real-time detection and removal of some potential defects, and then eliminating the need for future high maintenance. Protection costs.
Three: As much as possible to crash the maintenance assembly. A lot of concrete mixer owners have this feeling, like a certain assembly of the car after the crash repair will be out of place, so that the vehicle enters the maintenance period too early. The reasons for this kind of scene mainly touch on the repairman's assembly skills and the quality of accessories. Therefore, it is advisable to prevent the crash repair assembly, apply the skills and equipment of various advanced generations of protection equipment and tricks, to protect the car from disassembly, so as to prevent damage to the car assembly and components, improve the quality of protection, and then reduce maintenance. Total cost.

Copper Pipe/Sheet

Phosphor Bronze Pipe,Phosphor Bronze Round Tube,Tin Phosphor Bronze Round Pipe

Jiangyin Kaxite Energy-Saving Materials Technology Co., Ltd , http://www.challaluminum.com