Interim Measures for the Safety Management of Non-coal Mine Outsourcing Projects - Chapter I General Provisions

"Outsourcing non-coal mine safety administration Interim Measures" published

State Administration of Work Safety, Order No. 62

The Interim Measures for the Safety Management of Non-Coal Mine Outsourcing Projects was reviewed and approved at the Office of the Director General of the State Administration of Work Safety on July 29, 2013. It is hereby promulgated and will be implemented as of October 1, 2013.

Yang Dongliang, Director of the State Administration of Safety Supervision

August 23, 2013

Interim Measures for the Safety Management of Non-coal Mine Outsourcing Projects

Chapter I General Provisions

Article 1 In order to strengthen the safety management and supervision of non-coal mine outsourcing projects, clarify the responsibility for production safety, and prevent and reduce production safety accidents (hereinafter referred to as accidents), in accordance with the "Safety Production Law of the People's Republic of China" and the "Mineral Safety Law of the People's Republic of China" And these other relevant laws and administrative regulations, the formulation of these measures.

The second is in the range of approved mining law, outsourcing engineering manner in metal and nonmetal mine exploration, construction, production, or ceased operations, such as construction activities, as well as exploration, development, storage and transportation of oil and gas and engineering These measures are applicable to the safety management and supervision of technical service activities.

These measures are not applicable to the construction and installation of non-coal mine housing and its ancillary facilities, as well as the safety management and supervision of outsourced works for ground transportation construction outside the open pit mining area.

Article 3 The safe production of non-coal mine outsourcing projects (hereinafter referred to as outsourcing projects) shall be the responsibility of the contracting unit and the contractor shall be responsible for the safe production of the construction site.

Where there are multiple contracting units in the outsourcing project, the contracting unit shall implement unified coordination and management of the safety production work of multiple contracting units.

Article 4 The surveying units, design units, supervision units, technical service agencies and other relevant units undertaking the outsourcing project shall perform their respective safety production duties and undertake corresponding safety in accordance with laws, regulations, rules, national standards and industry standards. Production responsibility.

Article 5 Non-coal mine enterprises shall establish incentive and restraint mechanisms for safe production of outsourcing projects, and improve the safety production management level of non-coal mine outsourcing projects.

Industrial High Speed Disperser

Hydraulic lifting high speed disperser,Vacuum high shear paint disperser,Industrial High speed disperser,planetary dispersion mixer,vacuum high speed disperser.

Stirring, dispersing when the air absorption stay very little

The effect of mixing and blending is good
Medium and high speed stirring and dispersing can make the material dissolve quickly
Particle change, stable rise and fall, no mechanical loss
Stepless speed regulation, single shaft or double shaft mixer can be selected according to the actual situation

Hydraulic lifting high speed disperser,Vacuum high shear paint disperser,Industrial High speed disperser,planetary dispersion mixer,vacuum high speed disperser.

Chile(Shanghai) Mechanical Technology Co.,Ltd , https://www.chileintelligence.com